Toilet Repair Toilet Installation Toilet Waterproofing Pipe Repair Water Heater Repair Water Heater Installation Roof Repair Roof Waterproofing Ceiling Leak Repair Water Tank Cleaning Water Tank Repair Water Tank Installation Water Filter Installation Water Pump Installation Tap Replacement Low Pressure Diagnosis Drainage & Sewage Emergency 24/7
About Projects Blog Reviews Contact
WhatsApp Us
Home › Projects › Bukit Jelutong
Case study · Bukit Jelutong

New Stainless Steel Rooftop Water Tank, Bukit Jelutong

Rooftop tank install · 2026-04 — completed for The Wong family, Bukit Jelutong landed home.

New stainless steel rooftop water tank installed on a Bukit Jelutong home

The problem

The Wongs' 12-year-old 1,000L poly tank had developed a hairline stress crack near the base and was weeping into the rooftop slab. The crack was patch-able but the tank was already past its expected life in Malaysian sun. The household had grown — they wanted 50% more capacity and a level controller so the booster pump wouldn't dry-run if the tank emptied during a mains outage.

What we did

We sized up to 1,500L based on their 5-person household and 24-hour backup target. Switched material from poly to 304 stainless for double the service life. Re-engineered the galvanised frame to take the heavier full-fill load. Re-routed the overflow pipe properly away from the AC compressor pad (the original install had dumped overflow straight onto it). Added a SQFlex level controller that cuts the booster pump if the tank drops below 15% — protects the pump on long mains outages.

Scope

  • Old poly tank removal
  • Galvanised frame upgrade
  • 1,500L 304 stainless tank install
  • Overflow line re-route
  • Float valve & level controller
  • Booster pump re-integration
  • First-fill commissioning

The outcome

Job took 2 working days from old-tank removal to first fill. Pressure to the upstairs bathrooms improved noticeably because the new tank sits 30cm higher than the old one. Booster pump cycling has stopped entirely — the new tank's volume buffers daily demand properly. Six-month follow-up: tank dry, no overflow events, family happy.

They asked the right questions before we bought anything. How many people, how often does the mains drop out, do you mind paying more upfront for longer life. Made the choice clear. Two days from start to finish and we haven't thought about the tank since. — Wong, Bukit Jelutong